Your façade scaffolding company in Geneva
Scaffolding for façade works in Geneva
No serious work on a façade is done without stable access. Scaffolding gives the workers a platform at every level, protects passers-by and allows the façade to be inspected at close range. It represents an important part of the organisation of the site.
MS Contractor SA does not erect scaffolding itself. This work is carried out by a specialist partner company, which we coordinate. We include it in our quote and in our schedule, so that you do not have to deal with it separately.
What we carry out
The scaffolding is defined according to the works planned, the height and what lies at the foot of the building.
- Frame façade scaffolding, tied to the wall
- Widened brackets for the work of the façade contractors
- Protective nets and sheeting
- Protective tunnel or canopy for pedestrians
- Stair tower for workers’ access
- Mobile scaffold tower for low heights
- Roofer’s platform at the roof edge
- Filling and touching up of the tie points by our team at dismantling
How we work
We visit the premises with the partner scaffolder, who records the heights, the nature of the ground, the entrances to be kept clear, the shop windows, the overhead lines and the planting, and then draws up the erection plan.
Before erection, we inform the residents and, where needed, the ground-floor shopkeepers. The scaffolding is formally handed over before being used, then checked during the works. It is only dismantled after our final visit with you, because any touch-up becomes complicated once it has gone.
Specific features in Geneva
When scaffolding stands on a pavement or a roadway, it occupies the public domain. Permission must be obtained from the municipality before erection, and the signage and the pedestrian route are settled on that occasion. The partner scaffolder takes care of this procedure.
In narrow inner courtyards, on garage roofs or above glass roofs, erection calls for particular supports. Along a shared boundary, the neighbour’s consent is sometimes needed to set a foot on the adjoining plot. We deal with these questions before fixing a date.
What helps us prepare your quote
- The number of storeys and the height of the façade
- The sides to be scaffolded
- Photos of the foot of each façade
- Whether there is a pavement, a café terrace or a shop window
- The access for a delivery lorry
- The nature of the works planned on the façade and on the roof
Frequently asked questions
Do you erect the scaffolding yourselves?
No. It is erected, checked and dismantled by a specialist partner company. We coordinate its work with ours.
Can scaffolding be hired without entrusting the works to you?
Our activity covers façade works as a whole. Scaffolding is planned within that framework, not as a stand-alone service.
How long does the scaffolding stay in place?
For the length of the works, which depends on their nature and on the weather. We do not set a duration in advance, but we have it dismantled as soon as the final visit has taken place.
Can the scaffolding be used for other works?
Yes, and it is advisable. Sheet-metal work, eaves, blinds or windows can be dealt with while it is in place, by our partners or by our team depending on the trade.
No-obligation quote
Tell us about your project. We call you back to arrange a visit, then we send you a no-obligation quote. Our team works in French.
